Just a convenient way to 'off load' some road planings if nearby resurfacing is in operation
They need to solve the surface water drainage problem before they are to seriously think about mending UCR's
Thats why i'm not bothered about seeing this kind of work completed, its all too much of the same
'Fly tipping' wacky style
The way the surface is shaped most of the surface water would run into the field at present as there is a large ish hump in the entrance to the UCR' that'll change when the farmer realises