Thanks mate, only one short section completed, unfortunately tons more to do
Never mind, the locals that walked up through (young family of four) had heard of the wonderful volunteering that the Devon TRF had completed before, thanked us this time as well
To be honest there is only one digger track that moved, that was the lonely one half way up the green road, just before Jacks hand written sign.
The stream section we would like motor cycles to ride needs a tweak but the M. cycles are riding the bank
All the works previously completed by those wonderful volunteers is holding up really well (apart from the one digger track mentioned)
The main point is Wacky's plan is working
There is one sleeper (one we didn't replace or alter) rotted out, snapped, can't find one half this now leaves a wide river crossing the locals have to traverse, not good, planning in progress
You can see in most places where the storm water has washed over to the full width of the green road, scary amount of storm water, plenty of tree roots exposed on the main drag right up through even where they weren't exposed before..
It's in desperate need of a foliage cut....new sleeper, tons & tons of gravel/stone needs pushing around & used for building platforms for sleeper/s
One Ash tree we left on one of the early sleeper crossings is causing you to lean out past it, tree getting bigger in diameter? then I though that could also be my expanding belly, need a second opinion...I'll ask barky
All in all i've taken on a big project with an effective plan, its working...
A MASSIVE thanks to all those Devon TRF volunteers who worked/volunteered on this project for well over 2 yrs is amazing, without that help I truly believe the surface of this green road would have been lost, washed away, gone, closed, TTRO'd for sure, locals would have been moaning & blaming motor cycle use.
So...special thanks to Devon TRF volunteers in the past, present, future, you've helped save a superb green road..
More works completed on 'Ham lane' yesterday evening, 3 hours in all, a HUGE privilege to volunteer along side these guys, they work like Trojans, deepest respect
Volunteering works competed -
More in-fill to a digger track, buckets of stone inserted into & behind, more weld mesh added
Unearthing an old sleeper (not one we put in) from the steam, washed down
Re worked the slope out from the stream, in- fill material building up the surface
Re arranged the concrete slabs that are in the stream, lying in an awkward position
Re-working the Devon shovel so I could have better capacity for digging, nice to have friends
Another digger track re filled after the winter storms
Surface re-worked and restored
Erosion taking place nicely, opposite the digger tracks & other places on the streams outside bend
The lovely gully re filled on the exit/entrance of the stream
Re-worked the concrete in the stream to make a more rideable route
Two lumps of concrete rearranged in the stream, they were sticking up on there edge
Stream gully re-filled
Adding more weld mesh to the already successful digger tracks
we (only 3 of us) took out one digger track that was whole then 2 lengths of tracks that were cut, the guys worked their magic and slipped in the cut digger tracks in behind the sleeper on the up stream side.
they used road pins or re-bar and drove them in to support the cut length of digger track, this will help support the bank or the abutments to the sleeper bridge.
We spent some time digging out stone & used some finings to cover the path section along with raising this section (slightly)
I'll be heading out there again next Tuesday evening 30/6/26. vegetation clearance is on the cards plus I'll be taking out some more digger tracks.
John, Mark, Tim & myself took the Ham lane project a lot further on Tuesday evening, two more digger tracks to the lane plus another in site, two inserted on the bank to the northern side. One digger track dug in on the opposite bank, forming abutments for the pending sleepers
The guys put in a big shift carrying up digger tracks from the lower end of Ham and moving barrow loads & bucket loads of stone, there's only 10% of the roads surface left in a few places the rest of the width is water.
Huge thanks to the guys, thats five sessions completed in June, every Tuesday evening
2 more digger tracks inserted
one digger tracks inserted & tons of stone to help raise the surface & prevent wash out occurring down through the road.
Tim never stops nor has he missed an evening session - thanks mate...
10% (if your lucky) left of the roads surface
-- Edited by wackyracer on Thursday 2nd of July 2026 04:44:16 AM
I will be there on Tuesday this week, is there any light duties I can be detailed with.
Have got hedge trimmer etc.
Trevor
Which end are you meeting.
Would be extremely good to see you Trevor, plenty of gravel to shift but there will be tons of options for light duties, if you want to ride your motorcycle I'll have hedge cutting gear there or simply turn up with some vocal support mate
Denise Scott posted this on Dalwood daily's FB page
FYI and if you wish to attend. The July Dalwood Parish Council Meeting is tomorrow Evening at 7.30pm in the Village Hall. Please Click on the Link below to access the Proposed Agenda Details which are available to View on the new Dalwood Parish Council Website.
I replied Thank you for the information Denise.
Could you give a Big shout out to the Devon trail riders fellowship for their volunteering on Ham Lane (zig zag path)
Weve been there every Tuesday in June, repairing & improving!
Hopefully there will be some new sleepers arriving in July courtesy of DCC PRoW, well get them installed as soon as possible!
Many thanks Ian
Devon trail riders fellowship
4 likes on dalwood daily (thats a pretty good reply for their community)
Hilary Horley replied
Well done Devon Trail Riders and thank you for all your hard work.
Denise Scott replied
it's a lovely Photo of u all. Happy Smiley Faces - u should send it in to the Parish Paper with a little Write Up about what u've been doing up there !..
The Sixth session on Tuesday (7/7/26) solved the root climb by inserting 'Tomb stone ramp' Ideal piece of stone that fits the job nicely. Special thanks to the lads who turned up to help
Thank you to Devon TRF chair Trevor for putting in a shift & more importantly turning up to support our little project - thanks mate.
I've posted a request for information on the land owner via the dalwood daily's FB page, the request has been approved by admins this morning, hopefully we'll get a response
six more digger tracks delivered to the ham lane ready for Saturdays big push
Barky & I strimmed a fair portion of the lane/green road, just over half way from the Eastern end but that is most of the foliage sorted, few low branches that need sorting and the dead rotted tree.
The 'golden moment' came as we were unloading the gear the landowner turned up in his trusty VW estate, asking if he could get through to his field, my eyes popped up, got my attention now! which field is yours mate...that one there, cool I said, why he replied, cos I need a favour...
So a plan was hatched, mutual respect given & he's a motor cycle owner x3 greedy that is
Anyways good volunteering achieved last night with Barky - thanks mate
Great timing, and good to hear you've managed to chat to the landowner.
Pivotal moment actually Ray.
Nasty bit of work is Mr Parises, the previous guy I spoke to back in 2022, he led me to think he owned the field to the left of ham. He was renting it for hay & grazing
He denied us access back then in 2022, he's also the one responsible for the illegal wooden gates at the top end of Ham, they cross the green road and are always open to allow the animals to run from field to field, whilst this shuts off access to ride Ham lane un-interrupted....the local councillors at the time weren't happy...
Anyways we've made contact & chatted to our new mate 'Hugh' did I tell you he has motorcycles to? he wants to ride Ham lane
7 hours for three of us, Barky put in a morning shift but had to go at 12, good man, we achieved tons, a few dramas but the main man of the day sorted it all
Met our new friend the land owner, he's happy & thanked the guys
There won't be any photos or a description of the session, I put a live update on Devon TRF's FB page in the morning only to be greeted with "you shouldn't be doing that" with a long post on things we were doing wrong!!
It only takes one negative person to ruin a project or not get a project of the ground (seen this happen loads of times in DTRF world) Negativity is growing chaps & you're killing your own hobby
The Muppets are growing in numbers folks, negativity is increasing, lack of volunteers will see lanes out of use, you chew on it BUT don't whinge when it does come round!!
Thanks to the four for their hard grafting session
A reply from Ros Davies whilst in communication I slotted in we we're back in 'Ham lane' Dalwood volunteering, probably the most enthusiastic person in the world of Devon county Pro rights of way team! always chatted & supported 100's of people through out Devon in volunteering on the network
Thank you Ian for your message and so pleased all is going well with P3 and Sidmouth.
Great to hear about Ham Lane a blast from the past! Well done all of you with all your efforts on Tuesdays and over the weekend. Great to know you have managed to secure better site access, that is good news!
Hello Emma After this Saturdays enormous effort put in by a few trail riders (four) we are more than ready for those giant, long sleepers to span one missing gap in the stream crossings, this is one that had rotted out in the winter of 2025 and subsequently washed a little ways down stream, all recovered but broken in two. Just a foot note - This sleeper was an Orginal & not replaced back in 2022
The locals won't have any where to cross over at this point in the winter months, for the moment the stream bed is flat & quite high for them wonderful users to cross. Happy to drag said sleepers down from the top of 'Ham' and install in the correct position. Please don't leave it too long as the weather will break one day and I don't like getting wet! Lol